How Long Does a Shower Installation Take? A Complete Timeline Guide

You're ready to replace that outdated shower, but there's one question keeping you up at night: how long does shower replacement take?
Whether you're dealing with a cracked shower pan, dated tile, or simply dreaming of a more functional space, understanding the professional shower installation timeline helps you plan accordingly.
The good news? With the right professional team, most shower installation times average 1 to 5 days, depending on your project's scope.
What Determines Your Shower Installation Time
Not all shower projects follow the same schedule. Here's what you can expect:
- Standard shower replacement: 1 to 2 days
- Walk-in shower installation time: 2 to 3 days
- Custom tile shower: 3 to 5 days
- Full bathroom remodel with shower: 1 to 2 weeks
These timeframes reflect professional shower installation by experienced contractors who manage the step-by-step process efficiently. Your specific shower remodel duration depends on the type of shower you're installing, your existing bathroom conditions, and any unexpected issues.
Step-by-Step: What Happens During Installation
A standard shower replacement takes 1 to 2 days. Day one includes removing the old shower, inspecting walls and plumbing, and installing the new shower pan. Day two covers wall installation, plumbing connections, fixtures, water testing, and cleanup.
A walk-in shower installation typically takes 2 to 3 days. The first day involves demolition, plumbing adjustments (especially for tub-to-shower conversions), and subfloor modifications for proper drainage. The following days focus on installing the shower base, waterproofing, wall panels, and fixtures such as benches or grab bars, ensuring a seamless, barrier-free design and proper water flow.
A custom tile shower requires 3 to 5 days for top-quality results. After demolition and cement board installation, waterproofing and precise tile work are completed. The final days include grouting, sealing, fixture installation, and curing, resulting in a durable, beautifully finished shower built to last.
Pro Tips: Factors That Affect Your Timeline
What Might Extend Your Timeline:
- Hidden water damage requiring remediation
- Plumbing modifications or drain relocations
- Custom features like multiple showerheads or steam systems
- Material availability delays
What Keeps Your Project on Schedule:
- Standard-size replacements using existing footprint
- Design-build approach eliminating coordination delays
- Pre-selected materials before installation begins
- Experienced installation team
Planning Your Shower Installation
Schedule a consultation to assess your specific situation and get an accurate professional shower installation timeline. Arrange temporary bathroom access, clear the work area, and ask about each step of the process.
With a full-service firm managing both design and construction, everything is done for you, on time and on budget.
Your New Shower, Faster Than You Think
Most professional shower installations are completed within 1 to 5 days. Understanding how long shower replacement takes helps you plan accordingly while working with experienced contractors who deliver quality workmanship and superior project management.